on the basis of this generate a formal report with...submitted by environmental inspector...submitted to ARE(highways) ,checked by CRE.. Environmental Compliance Site Inspection Checklist


**FORMAL REPORT ON ENVIRONMENTAL COMPLIANCE SITE INSPECTION** **Submitted By:** Sajid Ali Environmental Inspector **Submitted To:** Assistant Resident Engineer (ARE), Highways **Checked By:** Chief Resident Engineer (CRE) --- **DATE:** 12-04-2026 **INSPECTION DATE:** 11/04/2026 **PROJECT:** Construction / Metaling of Road from Gorikote Astore to Shagharthang, Skardu **CHAINAGE / LOCATION:** From KM 9+200 to KM 12+000 **WEATHER CONDITIONS:** ☐ Sunny ☑ Rainy ☐ Snow ☐ Cloudy ☐ Windy **INSPECTION TYPE:** ☑ Special / Complaint Based **PHASE OF WORK:** ☑ Construction --- **COMPLIANCE SUMMARY** | Total Items Checked | Compliant (C) | Non-Compliant (NC) | Partially Compliant (P) | Not Applicable (N/A) | Compliance Rate (%) | |---------------------|----------------|---------------------|--------------------------|----------------------|----------------------| | 25 | 20 | 3 | 2 | 0 | 80 | --- ### INCLUSIVE ENVIRONMENTAL, COMMUNITY & OHS INSPECTION CHECKLIST | S.No | Compliance Parameter | Status (C/NC/P/N/A) | Remarks / Evidence | Corrective Action | |------|----------------------|---------------------|--------------------|--------------------| | I. | Trees cut only where absolutely necessary; minimum vegetation clearance practiced | NC | Efforts to avoid crops and native/community trees noted, but worker and operator negligence (boulder impact along road bank) caused additional, preventable tree damage. | Reinforce training to minimize unnecessary damage to roadside trees. | | II. | Workers prohibited from cutting trees/wood for cooking or heating; gas cylinders provided | C | LPG is used for cooking; no tree cutting was observed on site. | Precautionary monitoring is recommended. | | III. | Photographic & botanical inventory of vegetation completed before site clearing | C | Detailed records of cut trees are maintained. | Continue diligent documentation for compensatory plantation. | | IV. | Workers showing responsible behavior by avoiding harm to crops and trees in adjacent farming fields | C | No evidence of damage observed. | Maintain awareness to ensure continued compliance. | | V. | Up-to-date well-tuned machinery with reduced noise | C | All machinery is fit for operation without excess noise. | Routine checks should continue. | | VI. | Ill-maintained or noisy machinery used near communities | C | No issues; worksite distance is compliant. | Maintain this operational standard. | | VII. | Water sprinkling at dust-prone areas near communities | NC | Sprinkling is for compaction, not dust control. | Implement dust control measures. | | VIII. | Wastewater from washing & kitchen released into sumps | C | Proper sumps are in place; no direct discharge. | Monitor sump integrity regularly. | | IX. | Laborers polluting site or nearby water bodies | NC | Environmental awareness training needed due to lack of understanding. | Immediate training sessions required. | | X. | Fuel stock stored safely and refueling conducted following safety measures | C | Fuel is kept in a safe location. | Regular safety audits recommended. | | XI. | Machinery maintenance to prevent pollution | C | All machinery is functioning well with timely repairs. | Continue enforcement of maintenance schedules. | | XII. | Drinking water & sanitation at camps satisfactory | NC | Safe appearance, but no laboratory analysis conducted. | Immediate testing of water quality required. | | XIII. | Safety sign boards displayed | C | All necessary signage is evident. | Ensure ongoing visibility and condition. | | XIV. | Personal Protective Equipment (PPE) provided & used | NC | Required PPE not used by workers. | Provide and enforce PPE usage immediately. | | XV. | PPE provided & used by site engineers and inspectors | NC | Required PPE not supplied to site engineers. | Immediate PPE provision required. | | XVI. | Complaint Register maintained | NC | Complaint register lacking on site. | Establish a complaint register urgently. | | XVII. | Machinery movement restricted to designated haulage routes | C | All movements comply with designated routes. | Continue compliance monitoring. | | XVIII. | Underage employment prohibited | C | No underage workers observed. | Maintain strict age verification processes. | | XIX. | First aid facilities & emergency vehicle available | NC | Neither were present at the site. | Immediate provision of facilities and vehicle required. | | XX. | Noise levels in camp under permissible level | C | Noise within acceptable limits. | Continue monitoring. | | XXI. | Noise & light pollution from labor camp minimal | C | Levels maintained below limits. | Maintain awareness. | | XXII. | Area of worksite with significant erosion problem | P | Erosion risk due to current phase, stabilization needed. | Implement temporary erosion control measures. | | XXIII. | Excavation activities contributing to water pollution | C | No observed issues. | Maintain standards. | | XXIV. | Low speed limits to avoid livestock damage | C | Vehicle speeds are compliant. | Monitor compliance. | | XXV. | Current activities affecting community utilities | C | No current issues reported. | Continuous monitoring encouraged. | --- ### INSPECTOR'S REMARKS & RECOMMENDATIONS **Key Observations:** 1. Observations indicate good practices such as the use of LPG for cooking, protection of crops and trees, effective machinery operations, and non-discharge of waste into streams. 2. Critical gaps exist, highlighted by the absence of PPE, no first aid facilities, no emergency vehicle, absence of a complaint register, lack of laboratory testing for drinking water, and inadequate environmental awareness training for workers. 3. Past damages from boulders impacting roadside trees and exposed natural slopes require attention. **Overall Compliance Assessment:** ☐ Satisfactory ☐ Partially Satisfactory ☑ Unsatisfactory **Recommendations:** 1. Provision of PPE, first aid facilities, emergency vehicle, and complaint register is imperative; immediate actions needed for laboratory testing of drinking water; enhance worker environmental awareness through training; protect roadside trees; and implement temporary erosion controls until permanent measures are established. 2. Consultation with the Forest and Agriculture departments for appropriate saplings for compensatory plantation is requested. --- **Role Name / Signature** **Environmental Inspector (IEPL):** ______________________________________ Date: __/__/______ **Assistant Resident Engineer (Highways):** _______________________________ Date: __/__/______ **Chief Resident Engineer (CRE):** ______________________________________ Date: __/__/______ --- **End of Report**