The applicant intends to allocate a 1m x 1m area at each drilling location, minimizing the need for extensive trenching. During the invasive phase of the prospecting operations, only essential equipment will be utilized, including a percussion drill rig, two vehicles, and a small excavator or tractor-loader-backhoe for any necessary trenching. No additional infrastructure is required, and a campsite will not be established on the designated


